Pioneer performed a comprehensive Phase I Environmental Site Assessment at an active forge plant that encompassed more than 500,000 square feet. The facility was used for the forging/casting, stamping, and finishing of metal parts, specifically crankshafts, gears, steering knuckles, beams and other miscellaneous parts. Pioneer deployed two experienced project managers to the site in order to conduct a thorough assessment. The site inspection was performed over a several day period due to the size and complexity of the facility and operations. This assessment also included a review of potential wastewater compliance issues, as well as a review of air emissions permitting data that covered over 60 discharge points. After all the historical records, regulatory documentation, and site observations had been compiled and evaluated, numerous recognized environmental conditions (RECs) were identified in connection with the site.
Case Studies
Site Assessment
- Brownfields Redevelopment – Closed Municipal Landfill
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Brownfields Redevelopment – UIC South Campus Redevelopment Project
- PCA – 100 year old 12-Story Building
- PCA – Commercial Office Building
- PCA – Hotel
- PCA – Industrial Facility
- Phase I ESA – Active Steel/Forging Plant – Louisville, KY
- Phase I ESA – Historical Landfill Site – Upstate New York
- Phase I ESA – Internet Campus Redevelopment
Remediation
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- In-Situ Chemical Oxidation – Chlorinated Solvents at a Commercial Dry Cleaner
- In-Situ Chemical Oxidation – Heating Oil Release
- PCB Remediation Project – Chicago
- Regulatory Closure – Former Retail Gasoline Stations
- Remediation – CTA Bus Garage Redevelopment Project
- Remediation – Former Chemical Storage Drum Reconditioning Plant
- Remediation – Former Industrial Facility
- Remediation – Former Steel Manufacturing Plant
- Remediation – Historical Scrap Metal Facility
Geotech+Construction
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Geotechnical Investigation – Former CHA Redevelopment
- Geotechnical Investigation – Proposed 5-story Building, Chicago
- Geotechnical Investigation – Proposed High-Rise Building, Chicago, IL
- Geotechnical Investigation – Warehouse Facility, Chicago, IL
- Phase I ESA – Dam Inspection & Evaluation for Dam Safety Permit, Cortland, IL